Senin, 11 Januari 2010

Coastarina (World At Batam Island)



Batam island will be built artificial islands resembling a map of the world's largest in the world of real estate in Dubai beat. Housing in this beach developed into a residential center with the seaside atmosphere. Some of the area obtained from the reclamation. Site plan was designed like a giant lagoon which the middle arranged to resemble a miniature map of the world with different continents: Asia, America, Europe, Africa, and the Antarctic. Coastarina settlement is a breakthrough concept, inspired by the palm islands in Dubai, Uae. In coastarina, will build a total of 1000 houses in the area of the total 150 hectares (25 acres, including parks and public facilities). Over there, there are also okarina recreational park with food court, cafes and restaurants, water parks, giant walls, and water games. Coastarina mega project will be completed within 6 years and total investment is estimated to be 60 to 80 million usd, or about rp. 570 m / 760 rp m. Muri (Indonesian Record Museum) provides for coastarina acknowledged the board's biggest paper in Indonesia, located in the residential shoreline batam it will record two more records for the construction of the largest globe and world maps of the world's largest

Reaktor Nuklir Muria (Muria Nuclear Reactor)


Indonesia plans to build nuclear power plants (nuclear power) in the Muria, Central Java. Muria Mountains are considered the most qualified as a place to stand and operation of nuclear power plants. Besides being safe from the earthquake, Muria area is also very close to the water source (Java Sea) is needed to cool the nuclear reactors. Muria nuclear power plant development will begin in 2012 and inaugurated in 2016 is ready with a total budget of Rp 30 trillion. Expected in 2015-2016 Muria nuclear power plant has been able to operate with a capacity of 1000 with an investment mwat elektic us $ 1500-1800 per kwh. Nuclear power plants require uranium and Indonesia has two uranium mines, the mines and the black teen-mining rirang-red soil. The two uranium mines are located in west kalimantan. If the Muria nuclear power plant is built will be able to overcome the electrical energy crisis currently being experienced by our country. Muria nuclear power plant is planned to have six nuclear reactors with their helplessness, or a total 600 mw 3600 mw, will slightly reduce the electrical energy crisis, the network mainly Java-Madura-Bali. If Indonesia has a nuclear power plant, then Indonesia will also be entered into the ranks of the few countries of the world's nuclear elite but nuclear Indonesia will be used only for peaceful purposes